June 12, 2008 Steel Railings on E building

Three of the board members met with our contractor, owners rep, and architect this week. Things are looking very good in Breckenridge. We got our first look at the fabricated steel railing sections installed on the log newels. They are very impressive - with a nice bold look and feel to them. Siding installation is wrapping up on E building, and has already started on D. The framing crew is working on D-building; getting the dining room window rough openings prepared, and working on the balcony prep for the newels. The crews are slightly behind schedule but have a good plan to bring things back on track... more construction personnell are being brought in from a project completed in Copper Mtn, and the pace of progress on D building is significantly faster than E. Here are some photos of the progress.




 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this entry.
Comments
  • No comments exist for this entry.
Leave a comment

Submitted comments will be subject to moderation before being displayed.

 Enter the above security code (required)

 Name (required)

 Email (will not be published) (required)

 Website

Your comment is 0 characters limited to 3000 characters.