As of May 20, 2008 most of the E-building dining room windows are in and the new siding is going up. Most of the owner-option windows on D&E are also in already as well as the new entry doors. The contractor is starting to install the log newel posts that will anchor the new open railings. There has also been a significant amount of excavation work for the four new entries that are going in.


                                                    North side of E-building May 20, 2008



                                                   Excavation for D&E East Entrance Structure


                                                                 New Entry Door

 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this entry.
Comments

  • 7/21/2008 12:44 PM Don Holtmann wrote:
    New entry door photo is confusing.
    If it's the brown door, what type of hardware will be used? Lever for handycapped accessabilty or what? The arched panel at top of door? Where else in complex is this seen? Is this the color and is tha color the same for all units? Is this color any where else?
    Reply to this
    1. 7/29/2008 8:19 PM PPHOA wrote:
      The door in the picture is primed and has not yet been painted. All units are getting new entry doors. They will be painted to match the red/maroon siding color. The new entry door is indeed the one with the arched top. The hardware to be installed on the entry door is a nice handleset with a deadbolt. In the photo the handleset has not yet been installed, only the deadbolt. The ski locker will have a new knob with matching finish.  
      Reply to this
Leave a comment

Submitted comments will be subject to moderation before being displayed.

 Enter the above security code (required)

 Name (required)

 Email (will not be published) (required)

 Website

Your comment is 0 characters limited to 3000 characters.